The Foundation 3
-
Date: 2024.02.23
Wailuo Offshore Wind Power Project, located in Zhanjiang, Guangdong province,is plannaed to be equipped with 36 sets of MySE5.5-155 wind turbines with a total capacity of 198MW. The windfarm has the medium-weathered rock stratum with sandy soil and clay geology, the monopile foundation is finally chosen for the purpose achieve cost optimization that depend on the diameter of 6.5-7m which is applicable within water depth of 19m through the multiple round of iterative computations jointly carried out by the design institute and MingYang.The construction of the first monopile foundation is completed before June 30, 2018.

Popular recommendations
-

Ming Yang Smart Energy and ACWA Power Sign Strategic Cooperation Agreement
-

Ming Yang Unveils Next-Gen Medium-Speed Compact Semi-Direct Drive Portfolio and 50 MW Floating Turbine
-

Ming Yang announces major investment plan to supercharge the UK’s path to clean energy and lower bills
-

Over 1300 Ming Yang Offshore Turbines Ride Out Super-Typhoon Ragasa
-

Zhang Chuanwei and SCO Secretary-General Yermekbayev Discuss Global Energy-Transition Cooperation