MySE5.5-155
-
Date: 2024.02.23
The two MySE5.5-155 wind turbines are located at the positions of Y8 and Y9 in Xinghuawan Bay Wind Farm. The monthly generation of November of Y8 is around 2,400MWh.Moreover, the total generation after grid-on half year ago is around 11210MWh,while the equivalent generation hours of above-rated operation is 2040 hours, superior to those of all other wind turbines integrated into the grid simultaneously. The wind turbine at the position of Y9 has performed almost the same result as Y8 since it was integrated into the grid three months ago, which demonstrates the robustness, efficiency and reliability of MySE5.5-155 wind turbines.
Popular recommendations
-

Ming Yang Smart Energy and ACWA Power Sign Strategic Cooperation Agreement
-

Ming Yang Unveils Next-Gen Medium-Speed Compact Semi-Direct Drive Portfolio and 50 MW Floating Turbine
-

Ming Yang announces major investment plan to supercharge the UK’s path to clean energy and lower bills
-

Over 1300 Ming Yang Offshore Turbines Ride Out Super-Typhoon Ragasa
-

Zhang Chuanwei and SCO Secretary-General Yermekbayev Discuss Global Energy-Transition Cooperation