MySE5.5-155
-
Date: 2018.12.14
The two MySE5.5-155 wind turbines are located at the positions of Y8 and Y9 in Xinghuawan Bay Wind Farm. The monthly generation of November of Y8 is around 2,400MWh.Moreover, the total generation after grid-on half year ago is around 11210MWh,while the equivalent generation hours of above-rated operation is 2040 hours, superior to those of all other wind turbines integrated into the grid simultaneously. The wind turbine at the position of Y9 has performed almost the same result as Y8 since it was integrated into the grid three months ago, which demonstrates the robustness, efficiency and reliability of MySE5.5-155 wind turbines.
Popular recommendations
-
Zhang Chuanwei and SCO Secretary-General Yermekbayev Discuss Global Energy-Transition Cooperation
-
Ming Yang Smart Energy and Octopus Energy Forge Strategic Partnership to Accelerate Affordable UK Renewable Power
-
Zhang Chuanwei Addresses 25th CIFIT Opening and CIC Cross-Border Matchmaking Forum
-
Ming Yang School Officially Opens!
-
Ming Yang’s First Wind Turbine in Brazil Successfully Connected to the Grid